A production planning dashboard that keeps your promises realistic

Planners juggle orders, machines, people and material across the weeks ahead, usually in a spreadsheet only they understand. Brilliqs builds the dashboard that shows the schedule, the load on every work center and the backlog behind it, so you commit to dates the plant can actually hit.

  • Load against capacity for every work center
  • Plan versus actual by week, line and order
  • Backlog and promise dates on one screen
Years in delivery
20+Years in delivery
Enterprise clients
135+Enterprise clients
Data projects
500+Data projects
Shared by every team
1 planShared by every team
Overview

Plan the weeks ahead on numbers everyone can see

In many plants the production plan lives in one workbook on one planner's laptop. Sales asks for a date, the planner checks a few tabs, makes a call and hopes the shop floor agrees. When an order slips, nobody sees it coming, because the load on each work center, the material position and the maintenance calendar were never in the same place.

A production planning dashboard brings those pieces together. It shows what is scheduled on every line and work center over the coming days and weeks, how much of the available capacity that work consumes and which orders are waiting in the backlog. It then compares what was planned with what was made, so the next plan starts from evidence instead of last month's optimism.

Brilliqs builds this around how you plan today. We take your routings, calendars and order book, connect them to your ERP and shop floor records and design the views your planners and schedulers use every day. It sits inside our wider set of manufacturing dashboards. Once the plan is released, supervisors follow the shift itself on the production monitoring dashboard, while this view stays focused on the horizon ahead.

The problem

Why production plans keep slipping

Most plans fail for reasons that were visible in advance. They just were not visible to the people making the plan.

The plan lives in one spreadsheet

Only the planner knows how the workbook fits together. When they are away, nobody can answer a date question or see what changed since last week.

Load is checked by feel

Orders get added without a clear view of the hours each work center already carries, so some stations are overbooked while others sit waiting.

Material and maintenance are surprises

An order is scheduled, then the material is short or the machine is down for planned service. The conflict only shows up on the day it hurts.

Nobody measures plan adherence

Without a plan versus actual record, the same optimistic run rates go into every new schedule and the same orders keep running late.

What it does

What your production planning dashboard does

Each view answers a question planners ask every week. Here is what sits at the heart of the production planning dashboard Brilliqs builds.

01

The production schedule in one view

Every released and planned order is shown against its line, work center and date, so anyone can see what runs when. The production schedule dashboard replaces the private workbook with one shared picture.

  • Orders laid out by line, work center and day
  • Sequence, setups and changeovers made visible
  • Filters by customer, product family and due date
  • One version of the plan that everyone reads
02

Load against capacity, work center by work center

The dashboard converts scheduled orders into hours using your routings and sets them against the hours each work center has available. Overloads and idle gaps stand out before the week begins.

  • Required hours against available hours per work center
  • Overloaded weeks flagged ahead of time
  • Calendars, shifts and holidays applied to capacity
  • Planned maintenance windows held out of available time
03

Backlog, promise dates and plan adherence

Open orders sit in a backlog view sorted by due date and readiness. Completed periods are compared with what was planned, so schedule attainment becomes a number the team can improve.

  • Order backlog by age, value and due date
  • Promise dates checked against current load
  • Plan versus actual by week, line and order
  • Reasons captured when an order misses its slot
Built in

Features that make the plan dependable

Practical capabilities that turn the production plan into a tool the whole plant trusts.

Shared schedule board

A single board of orders by line and day, replacing scattered workbooks with one plan everyone can open.

Capacity load chart

Required hours stacked against available hours for each work center, week by week, with overloads colored.

Order backlog view

Every open order with its age, quantity, due date and readiness, so planners know what is waiting and why.

Material readiness check

Scheduled orders matched to stock and incoming supply, so orders without material are flagged before release.

Maintenance window overlay

Planned service on each machine drawn onto the schedule, so production is never booked onto a machine that will be down.

Plan adherence tracking

Schedule attainment by week, line and order, with miss reasons, so each new plan learns from the last one.

Business impact

What a shared production plan changes

The aim is not a prettier schedule. The aim is a plan the plant can follow and dates customers can rely on.

One plan

A schedule everyone reads

Sales, planning, production and maintenance work from the same plan, so date questions get one answer.

Earlier

Conflicts found ahead of time

Overloads, material gaps and maintenance clashes appear days before they would stop an order.

Steadier

Promise dates that hold

Dates are checked against real load and readiness, so commitments to customers rest on what the plant can make.

Better

Plans that learn

Plan versus actual history shows where run rates and lead times are too optimistic, so each plan gets more accurate.

How we roll it out

How Brilliqs sets up your production planning dashboard

A clear path from your current planning workbook to a shared plan. No new planning system required.

01

Map how you plan

We sit with your planners to understand the horizon, the planning buckets, the work centers and the rules they apply today.

02

Connect the inputs

We bring in orders, routings, calendars, stock and maintenance schedules from your ERP and planning tools, and production records from the floor.

03

Build the views

We design the schedule board, the capacity load chart and the backlog view, then tune them with planners and production managers.

04

Roll out and refine

We start with one area or product family, use the first weeks of plan versus actual to adjust rates, then extend across the plant.

What it measures

The planning measures your dashboard tracks

A plan is only as good as the measures used to check it. These are the signals we surface for planners and schedulers.

Schedule

  • Orders scheduled by line, work center and day
  • Schedule attainment for each week and line
  • Planned against actual quantity per order
  • Orders resequenced or moved since last plan

Capacity

  • Required hours against available hours
  • Load percentage for each work center and week
  • Overtime or extra shifts needed to close gaps
  • Capacity held for planned maintenance

Backlog and orders

  • Open order backlog by age and value
  • Orders at risk of missing their promise date
  • Orders waiting on material or tooling
  • Lead time from order entry to completion
Where it fits

Where a production planning dashboard earns its keep

The same plan supports very different decisions across the week. A few of the ways teams put it to work.

Weekly planning meetings

Planners, production and maintenance review the coming weeks on one screen. Overloaded work centers and late orders are settled in the meeting instead of discovered on the floor.

  • Capacity load reviewed week by week
  • Conflicts resolved before release
  • Decisions recorded against the plan

Answering a delivery date

When sales asks if a new order can ship by a date, the planner checks the load on the work centers it needs and the material position, then gives an answer backed by numbers.

  • Required routing hours checked against free capacity
  • Material readiness confirmed for the order
  • Promise date set from the actual plan

Recovering a slipped plan

When last week's plan versus actual shows orders falling behind, the team sees which work center caused it and rebuilds the sequence for the days ahead.

  • Missed orders traced to the work center
  • Backlog reprioritized by due date and value
  • Overtime or alternate routings tested

Coordinating with maintenance

Planned service windows appear on the production schedule, so planners load work around them and maintenance gets machine time without fighting for it.

  • Service windows visible on the schedule
  • Capacity reduced where machines are down
  • Orders moved off machines due for service
Before and after

Spreadsheet planning versus a production planning dashboard

The difference is not only convenience. It changes whether the plan can be trusted by anyone other than the planner.

Planning in a spreadsheetWith a production planning dashboard
Who can see the planOne planner and whoever they emailEveryone, from sales to the line supervisor
Checking capacityA rough feel for which stations are busyRequired hours against available hours per work center
Material and maintenanceChecked separately, often too lateShown as constraints on the same schedule
Order backlogA long list sorted by whoever shouts loudestSorted by due date, age, value and readiness
Learning from the last planNo record of what was planned versus madePlan adherence tracked by week, line and order
Connected data

Built on the planning data you already hold

You do not need to replace your ERP or buy a new scheduling system to plan well. Brilliqs reads orders, routings, work center calendars and stock from the systems you already run and joins them with completed production from the shop floor.

Because our roots are in data engineering, the joins behind the plan stay correct as products, routings and work centers change. Material readiness draws on the same stock figures as the manufacturing inventory dashboard, and service windows come from the same calendar as the preventive maintenance dashboard, so the plan never disagrees with the teams it depends on.

ERP systems such as SAP
Advanced planning and scheduling (APS) tools
MES and production order records
Routings, bills of material and work center calendars
Inventory and warehouse systems
Maintenance planning systems
Planner spreadsheets during the transition
Cloud or on premise deployment
A real scenario

The order that looked fine until Thursday

A short example of how the same week reads with and without a shared planning view.

Picture a planner on Monday with a full order book. The spreadsheet says the week fits. On Thursday the paint line falls behind, a key component has not arrived and a press is offline for its scheduled service. Three orders miss their dates and the customer service team finds out from an angry phone call.

On a production planning dashboard the same week looks different on Monday. The capacity load chart shows the paint line booked well beyond its available hours. The material check flags the order waiting on the late component. The maintenance overlay shows the press is out on Wednesday.

Nothing about the plant changed. What changed is that the planner saw three conflicts four days early, moved one order forward, split another across a second line and agreed a new date with the third customer before anything was missed.

The week after, plan versus actual shows the paint line has run behind its planned rate for a month. That rate goes into the next plan, and if the team wants to understand why the line keeps underperforming, the history moves into production analytics for a deeper look.

Why Brilliqs

Why manufacturers plan with Brilliqs

Plenty of tools draw a Gantt chart. We build a plan view that matches how your plant schedules and stays accurate as you grow.

Your planning rules

We model your horizons, buckets and work centers as they are, rather than forcing a generic planning template.

Serious data engineering

Orders, routings, stock and calendars joined correctly, so load and readiness figures can be trusted.

Vendor neutral

We work with the ERP and planning tools you already own and stay independent of any single software brand.

Support that stays

We help planners adopt the view and keep rates, calendars and rules current long after launch.

Who it is for

Made for the people who own the plan

A production planning dashboard gives each role the part of the plan they need to act on.

Production Planners

Build and adjust the plan on one shared view, with capacity, material and maintenance in front of you.

Schedulers

Sequence orders by work center, see the load you are creating and spot clashes before release.

Production Managers

See what is coming at each line over the next weeks and staff to the plan rather than react to it.

Supply Chain Managers

Match the order backlog to material availability and give customers dates the plant can keep.

Maintenance Planners

Book service windows onto the same schedule production uses, so machine time is agreed in advance.

Operations Heads

Track schedule attainment and backlog trends to judge whether the plant is keeping its commitments.

Questions, answered

Production planning dashboard questions

Straight answers to what planners and production leaders ask before they move the plan off a spreadsheet.

What is a production planning dashboard?

It is a shared view of your production plan over the coming days and weeks. It shows scheduled orders by line and work center, the load those orders place on available capacity, the order backlog with promise dates and how closely actual output followed the plan in past periods.

How is this different from a production monitoring dashboard?

A production monitoring dashboard follows the current shift as it runs, showing pace against the shift target. A production planning dashboard looks ahead across days and weeks and asks whether the plan fits capacity, material and maintenance. Most plants use both: planning sets the schedule, monitoring tracks its execution.

Does it forecast demand?

No. The planning dashboard works from your confirmed and planned orders and checks them against capacity. Forecasting future demand or output from history is the job of production analytics. Where you have a forecast, the dashboard can show it as an input alongside firm orders.

How does the capacity planning view work?

It converts each scheduled order into hours using your routings, then sets those hours against what each work center has available after shifts, holidays and planned maintenance. Weeks where required hours exceed available hours are flagged so planners can act early.

What does plan versus actual measure here?

It compares what the plan said each line or order would produce in a period with what was actually completed. Over time this shows schedule attainment, where the plan is consistently optimistic and which work centers cause most misses, so future plans use realistic rates.

Do we need a new planning system?

No. Brilliqs reads orders, routings, calendars and stock from your existing ERP and planning tools. If parts of your plan live in spreadsheets today, we can bring those in during the transition rather than asking planners to change everything at once.

Can it compare capacity across several plants?

This dashboard focuses on the work centers and lines inside a plant, where scheduling decisions are made. For comparing capacity and performance between sites, the factory performance dashboard is the better fit, and the two can share the same data.

See your plan against your real capacity

Book a short demo and we will show you a production planning dashboard built around one of your own work centers and order books.